English | Spanish | Dutch
Log in

Article over Brenner Base Tunnel's exploratory tunnel excavation

    Julian Buch
    By Julian Buch

    I bet this is an interesting thing to read.  Published in October 2019. Costs between US$7 and US$42.

    15 km TBM exploratory tunnel excavation in the construction Lot H33 of the Brenner Base Tunnel

    15 km TBM Vortrieb im Los Tulfes Pfons – Erfahrungen und Erkenntnistransfer auf das Hauptbaulos

    Andrea Lussu Dipl.‐Ing.   Sebastian Grüllich Dipl.Ing.    Christian Kaiser Ing.  Adrian Fontana Dipl.‐In

    https://onlinelibrary.wiley.com/doi/pdf/10.1002/geot.201900039

    image

    image