English | Spanish | Dutch
Log in

Robbins Single Shield TBM Breaks Through Turkey’s Hardest Rock

    Dave Anderson
    By Dave Anderson Replies (1)

    In an excellent article, Tunnel Business Magazine reports that, on July 24, 2020, a 26.2 feet (8.0 meter) ROBBINS successfully completed the boring of a 5.5 mile railway tunnel. The rock formation on the route of the tunnel for Bahçe-Nurdaği High-Speed Railway Tunnel is said to be among the hardest and most abrasive ever encountered in the country.

    https://tunnelingonline.com/robbins-single-shield-breaks-through-turkeys-hardest-rock/

    image

    image