Null

English | Spanish | Dutch
Log in

No. 1 Tunnel of Jakarta-Bandung high-speed railway successfully holed through

    Chu Yang
    By Chu Yang Replies (2)

    December 15 2020 day - No. 1 Tunnel of the Jakarta-Bandung high-speed railway (HSR) was successfully holed through. China-Indonesia cooperation project use Chinese technology TBM (Tunnel Boring Machine)

    Total length of 1,885 meters.

    http://www.xinhuanet.com/english/2020-12/15/c_139591822.htm

     

    image

    image