The search is on for what would be the middle of the ZojiLa tunnel, as it is from where Asia’s longest and one of the world’s highest road tunnels would be carved out, simultaneously, in opposite directions.
https://kashmirreader.com/2021/01/18/bang-in-the-middle-construction-of-the-zojila-tunnel/
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com
https://kashmirreader.com/2021/01/18/bang-in-the-middle-construction-of-the-zojila-tunnel/
Bang in the Middle: Construction of the ZojiLa Tunnel
kashmirreader.comCalled an ‘adit’ in tunnelling parlance, a horse-shoe shaped excavation in the middle will open up two passages in opposite directions
The 14.2-km-long tunnel is to be dug 700 metres below the surface.
The New Austrian Tunnelling Method for...