Null

English | Spanish | Dutch
Log in

Karavanke Tunnel: Cengiz already excavated 270 meters of the tunnel

    Stanko Novak
    By Stanko Novak Replies (1)

    Trucker magazine in Slovenia reports that excavation of second tube of Karavanke tunnel progresses as expected. Already Turkish company Cengiz has excavated 270 meters of 7,948 m long tunnel. The length of the tunnel from Slovenian side to Austrian border is 3,546 m.

    Expected finish time for all work in tunnel is May 2025.

    https://www.trucker.si/tunel-karavanke-iz-cengiz-insaat-sporocajo-izkopanih-je-ze-preko-270-metrov

    image

    image