The Santos Port Authority (SPA) has launched a public call for projects to implement & manage a submerged tunnel between Santos and Guarujá, writes Portal Portuario.
The authorizations issued by SPA must be published on the site http://www.portodesantos.com.br within 15 days after receipt of the requirements. After an authorization, participants must present their concepts to the Port Authority within 120 days.
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com
https://portalportuario.cl/spa-lanza-convocatoria-publica-para-implementacion-de-tunel-sumergido-entre-santos-y-guaruja/
SPA lanza convocatoria pública para implementación de túnel sumergido entre Santos y Guarujá - PortalPortuario
portalportuario.clPor Redacción PortalPortuario.cl @PortalPortuario La Autoridad Portuaria de Santos (SPA) lanzó una convocatoria pública de proyectos destinado a la implantación