With a total length of 5,506 meters, Gaojiaping tunnel of Zhengzhou-Wanzhou high-speed railway (Zhengwan high-speed railway) completed drilling on Monday after 4 years.
http://www.ecns.cn/video/2021-04-14/detail-ihakiuvi4581054.shtml
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com
http://www.ecns.cn/video/2021-04-14/detail-ihakiuvi4581054.shtml
Drilling completes on high-speed rail tunnel through Hubei karst landscape
www.ecns.cnWith a total length of 5,506 meters, Gaojiaping tunnel of Zhengzhou-Wanzhou high-speed railway (Zhengwan high-speed railway) completed drilling on Monday after 4 years.