https://www.youtube.com/watch?v=4CtaZvM4UeY
April 16th, Goyang Mayor Lee Jae-joon visited and inspected the main tunnel excavation site located near the planned site of Changneung Station and Lake Park. Section of Goyang City consists of a deep tunnel section with an extension of 20.26 km and an average of 50 m below ground.
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com
Goyang Mayor Lee Jae-joon visited GTX-A site.
https://www.youtube.com/watch?v=4CtaZvM4UeY
Voordat je verdergaat naar YouTube
www.youtube.com