Null

English | Spanish | Dutch
Log in

CREG TBM for Świna Tunnel-- How the shield looks like before and after work

    Teodor Adamczyk

    Project owner GDDKiA has published before-after photographs of the CREG Tunnel Boring Machine after it excavated under the Świnoujście Sea.

    1,780 metres long Świną tunnel between the islands of Uznam and Wolin will be the longest underwater crossing in Poland with 1,484 meters under the water.

    The tunnel is being constructed by GÜLERMAK and PORR

    https://twitter.com/GDDKiA_Szczecin/status/1455961090597298177

    https://www.eswinoujscie.pl/2021/11/04/tunel-w-swinoujsciu-zobacz-jak-wyglada-tarcza-przed-i-po-zakonczeniu-pracy/

    image

    image