Project has two tunnel sections, a 5.5km one from New Ashok Nagar in Delhi to Vaishali in Ghaziabad and 7 km tunnel from Brahmpuri to Begum Pul in Meerut.
Metro Rail News has the full story via the link below.
https://www.metrorailnews.in/tunnel-boring-work-sets-in-motion-for-rrts-project-in-ghaziabad/
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com
https://www.metrorailnews.in/tunnel-boring-work-sets-in-motion-for-rrts-project-in-ghaziabad/
Tunnel boring work sets in motion for RRTS project in Ghaziabad - Metro Rail News
www.metrorailnews.inNCRTC which engaged in the construction of the RRTS project kick-off the tunnel boring work on Monday, 28th February 2022. The 82km RRTS project will connect Delhi, Ghaziabad and Meerut through high-speed trains.