Null

English | Spanish | Dutch
Log in

Tunnel at the intersection of the South-Eastern chord with the Moscow Ring Road is 60% ready

 

Moscow City Construction Department head Rafik Zagrutdinov announced that tunnel at the intersection of the South-Eastern chord with the Moscow Ring Road is 60% ready.

The laying of the lower tier of metal structures to hold the soil, as well as the concreting of the tunnel pipes, is currently underway.

https://www.m24.ru/news/gorod/30042022/457042

image

image