Hyundai E&C is busy assembling 14 meter diameter tunnel boring machine to tunnel 6.76 km 2 lane tunnel 20-35 meter under Han river. This is for Section 2 of the Seoul Metropolitan Area 2nd Ring Expressway. Under-water part is 2.9 km.
Tunnel is 2 lane. Tunneling will start in October. Once Hyundai complete boring the tunnel, TBM will be un-assembled and reassembled in other direction. And the same length of tunnel again with two lane will be bored in reverse direction.
http://www.kyeongin.com/main/view.php?key=20220625010004580
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com
http://www.kyeongin.com/main/view.php?key=20220625010004580
수도권 제2순환고속도로 `김포~파주구간` 한강 하저터널 10월 굴진
www.kyeongin.com수도권 제2순환고속도로 김포~파주구간의 한강 하저터널 공사가 오는 10월 중순 시작될 전망이다. 수도권 제2순환고속도로(이하 제2순환도로) 2공구인 김포∼파주구간은 김포시 하성면과..