The cutterhead for the TBM that will bore London’s 1.4km long twin-lane Silvertown Tunnel has been lowered into the start shaft in preparation for boring to commence on the first tube later this summer.
https://tunnellingjournal.com/silvertown-tbm-prepares-late-summer-launch/
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com
https://tunnellingjournal.com/silvertown-tbm-prepares-late-summer-launch/
Silvertown TBM prepares for late summer launch
tunnellingjournal.comThe cutterhead for the TBM that will bore London’s 1.4km long twin-lane Silvertown Tunnel has been lowered into the start...