Null

English | Spanish | Dutch
Log in

L&T’s TBM Urja achieves third breakthrough of Bengaluru Pink Line

    A. Luthra
    By A. Luthra Replies (1)

    Larsen & Toubro’s Tunnel Boring Machine Urja (DZ670) achieved its third and final breakthrough at the Shadi Mahal TBM Retrieval Shaft on Bengaluru Metro‘s Pink Line (Reach 6), which is 21.386 km in length on 10 January 2023.

    https://www.constructionworld.in/transport-infrastructure/metro-rail-and-railways-infrastructure/l-t---s-tbm-urja-achieves-third-breakthrough-of-bengaluru-pink-line/38661

    image

    image