Larsen & Toubro’s Tunnel Boring Machine Urja (DZ670) achieved its third and final breakthrough at the Shadi Mahal TBM Retrieval Shaft on Bengaluru Metro‘s Pink Line (Reach 6), which is 21.386 km in length on 10 January 2023.
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com
https://www.constructionworld.in/transport-infrastructure/metro-rail-and-railways-infrastructure/l-t---s-tbm-urja-achieves-third-breakthrough-of-bengaluru-pink-line/38661
L&T’s TBM Urja achieves third breakthrough of Bengaluru Pink Line
www.constructionworld.inThis marks the 5th in a series of 6 tunnel breakthroughs.