English | Spanish | Dutch
Log in

Joshimath Sinking: Tunnel Connected To Tapovan Project Not Responsible For Subsidence, NTPC Tells Power Ministry

    A. Luthra
    By A. Luthra Replies (1)

    The country’s largest electricity-generating company told to the Power ministry that the tunnel is 1 kilometre away from the sinking town and at least a kilometre below the ground.

    https://news.abplive.com/states/up-uk/joshimath-sinking-ntpc-says-tunnel-away-from-town-one-km-belowno-role-tapovan-vishnugad-hydroelectric-project-in-subsidence-1575505

    image

    image