Tideway updates its cost estimate for the Thames Tideway Tunnel to 4.5bn...
https://www.newcivilengineer.com/latest/tideway-cost-of-londons-super-sewer-hits-4-5bn-26-04-2023/
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com
https://www.newcivilengineer.com/latest/tideway-cost-of-londons-super-sewer-hits-4-5bn-26-04-2023/
Tideway | Cost of London’s super sewer hits £4.5bn | New Civil Engineer
www.newcivilengineer.comThe super sewer project was initially costed at £3.52bn in 2014, but that figure has steadily crept up over the course of its construction. The latest