Null

English | Spanish | Dutch
Log in

Mumbai Coastal Road Project: Technical issues delay 2nd south-bound tunnel boring work

    Rohit Agarwal
    By Rohit Agarwal Replies (1)

    The project’s first phase (a stretch of 10.58km) is being constructed from the Princess Street flyover at Marine Drive to the Worli end of Bandra-Worli Sea Link.

    https://www.freepressjournal.in/mumbai/mumbai-coastal-road-project-technical-issues-delay-2nd-south-bound-tunnel-boring-work

    image

    image