English | Spanish | Dutch
Log in

4.1 KM Tunnel To Come Up On Mhow-Mukhtyara Balwara Section

    A. Luthra
    By A. Luthra Replies (1)

    The tunnel to be built 240 feet below the surface, will be ready in 30 months at a cost of Rs 450 crore..

    https://www.freepressjournal.in/indore/mp-longest-41-km-tunnel-to-come-up-on-mhow-mukhtyara-balwara-section

    image

    image