Null

English | Spanish | Dutch
Log in

CHINA: Shanghai -MST Railway Wusongkou Yangtze River Tunnel Project refreshed domestic excavation record

Shanghai Tunnel Engineering Co., Ltd. Tunnel Boring Machine break record in Wusongkou Yangtze River Tunnel Project at Shanghai -State Railway.

TBM finish a total 728 meters (364 rings) to refresh domestic 10 -meter mud water balance shield single -month excavation record.

http://sh.people.com.cn/BIG5/n2/2023/0727/c176737-40509346.html

image

image