Null

English | Spanish | Dutch
Log in

China: The right tunnel of Niubo No. 2 Tunnel of China Railway No. 5 Bureau Donglu Expressway was successfully completed

    Caihong Wen
    By Caihong Wen Replies (1)

    They overcame many construction problems such as complex and changeable surrounding rock, long-distance ventilation, complex geology, high-temperature operations, and tunnel water inrush...

    http://big5.news.cn/gate/big5/www.yn.xinhua.org/20230912/f937194d05474e52afecf605d12f0a91/c.html

    image

    image