Contractor PORR announces actual works for the construction of the tunnel from Momaia on Lot 4 of the Sibiu-Pitești highway start in mid-September.
Tunnel will be 1,3km and with 2 tubes. One in each direction.
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com
www.youtube.com