Null

English | Spanish | Dutch
Log in

Romania: PORR begins work on the Momaia tunnel on the Sibiu - Pitesti highway

    I. Stoica
    By I. Stoica Replies (1)

    PORR starts work on 10 kilometers long Curtea de Argeș – Tigveni lot which has Momaia tunnel 1.35 km with two separate galleries. New Austrian NATM method is used and finish in 3,5 years.

    https://www.oradesibiu.ro/2023/09/18/porr-incepe-lucrarile-la-tunelul-de-la-momaia-de-pe-autostrada-sibiu-pitesti-video/

    image

    image