JR Central changes opening date of maglev shinkansen line
it is not clear when the company will be able to start drilling a tunnel at a section in Shizuoka Prefecture.
https://www.japantimes.co.jp/news/2023/12/15/japan/maglev-shinkansen-opening-delayed/
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com
https://www.japantimes.co.jp/news/2023/12/15/japan/maglev-shinkansen-opening-delayed/
JR Central changes opening date of maglev shinkansen line
www.japantimes.co.jpThe line will open 'no earlier than 2027' due to uncertainties over when drilling works for a tunnel in Shizuoka Prefecture can commence.