NATM used for construction of Kuantan tunnel.
The relaunch of the East Coast Rail Link (ECRL) project on July 25 has kick-started the construction of the longest rail tunnel along the 223km line between Dungun in Terengganu and Mentakab in Pahang.
The 2.8km Kuantan Tunnel, located in Jabor near here, is the longest among the three tunnels of ECRL, which includes the 1.1km Paka Tunnel and 871m Dungun Tunnel, both in Terengganu.
https://www.nst.com.my/news/exclusive/2019/10/530451/kuantan-tunnel-longest-ecrl-line
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com
Paka tunnel 98.5% penetrated 6 month ahead of schedule
https://tunnelcontact.com/discussion/view/31764/the-first-tunnel-of-ecrl-in-malaysia-is-985-penetrated
The first tunnel of ECRL in Malaysia is 98.5% penetrated : TunnelContact.com
tunnelcontact.comThe Networking Site for Tunnel and Underground Space Professionals