English | Spanish | Dutch
Log in

Nepal: HRT tunnel of Kabeli-3 Hydropower Project complete

    Ravnish Sharma
    By Ravnish Sharma Replies (1)

    1875 meter long Headrace Tunnel (HRT) of the Kabeli-3 achived breakthrough. Constructor is Bhugol Infrastructure company.

    https://myrepublica.nagariknetwork.com/news/hrt-tunnel-of-kabeli-3-hydropower-project-completed/

     

    image

    image