The project is funded by JICA (Japan International Cooperation Agency) with a smaller (about one-fourth of project cost NRs 22 billion) contribution from the government of Nepal.
"A joint venture (JV) of Nippon Koei, Eight Japan Engineering Consultants, Nippon Civic Consulting Engineer in association with GEOCE Consultants, and ITECO-NEPAL is consulting on the construction project, while Hazama Ando Corporation, a Japanese construction company, is contracted for the construction..."
Details in the news source below.
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com
https://theprint.in/world/nepals-first-transport-tunnel-being-built-with-japanese-loan-witnesses-major-breakthrough/2042526/
Nepal's first transport tunnel being built with Japanese loan witnesses major breakthrough
theprint.inDhading [Nepal], April 15 (ANI): Nepal’s first-ever transport tunnel, the Nagdhunga-Sisneri Tunnel, being built with Japanese aid, witnessed a breakthrough on Monday. Nepali Prime Minister Pushpa Kamal Dahal switched on the electric control for the...