Null

English | Spanish | Dutch
Log in

China: World first rectangular pipe jacking TBM (built by CREG) for hard rock breaks through

    Caihong Wen
    By Caihong Wen Replies (1)

    Developed and manufactured by China Railway Engineering Equipment Group (CREG), the TBM, known as CREC 1112, has an excavation section 10.42m wide and 7.57m high.

    https://www.newcivilengineer.com/latest/world-first-rectangular-pipe-jacking-tbm-for-hard-rock-breaks-through-on-china-road-project-20-05-2024/

    image

    image