English | Spanish | Dutch
Log in

Mumbai-Ahmedabad Bullet Train On Right Track: Ghansoli Tunnel Excavation Complete

    A. Luthra
    By A. Luthra Replies (2)

    Indian company Afcons Infrastructure has successfully excavated a 394-meter-long Additionally Driven Intermediate Tunnel (ADIT) at Ghansoli using the NATM method.

    https://www.news18.com/india/mumbai-ahmedabad-bullet-train-on-right-track-ghansoli-tunnel-excavation-complete-8905443.html

     

    image

    image