English | Spanish | Dutch
Log in

Poland: Delay during the construction of the cross-city tunnel.

    Teodor Adamczyk

    No news. As before.

    Problems also appeared when the larger shield of TBM Katarzyna (Herrenknecht), which was drilling the tunnel, started drilling under the pressure of the buildings in Polesie. Then it turned out...

    https://lodz.tvp.pl/76935202/opozzenie-przy-budowie-tunelu-srednicowego-pkp-plk-bedzie-zamykac-kolejne-ulice-w-lodzi

    image

    image