Hà Nội Metropolitan Railway Management Board (MRB) Tunnel Boring Machine number one (TBM 1) started bore on 30 July. TBM 1 (also name Thần tốc) start at the S9 - Kim Ma station (17.8 m. under ground). After 200 metre, TBM 2 (also name Táo bạo) start bore. Baogiaothong vn write.
Boring will last 16 month. It is in project Urban railway project No. 3, Nhon - Hanoi Station. Total route 12.5 km long. 4 Kilometre is underground. In the route there are 8 over ground stations and 4 under ground stations.
read original
English
Hanoi metro Line 3 opens as tunnel boring starts
https://www.railwaygazette.com/metros/hanoi-metro-line-3-opens-as-tunnel-boring-starts/67097.article
VIETNAM: The western 8·5 km section of Hanoi metro Line 3 between Nhon and Cau Giay opened with the launch of free demonstration services on August 8. The official inauguration of Hanoi’s second metro line is scheduled for September.
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com
https://www.baogiaothong.vn/van-hanh-thuong-mai-tuyen-metro-nhon-ga-ha-noi-vao-ngay-9-8-192240802125220606.htm
Vận hành thương mại tuyến metro Nhổn - ga Hà Nội vào ngày 9/8
www.baogiaothong.vnBan QLDA Đường sắt đô thị Hà Nội (MRB) vừa có văn bản đề xuất UBND TP Hà Nội về kế hoạch tổ chức sự kiện lễ vận hành thương mại đoạn trên cao tuyến đường sắt đô thị Nhổn - ga Hà Nội.