Use of predictive model for identification of overall wear state of TBM cutterhead based on tunneling parameters
Gang Wang a b, Jenisha Singh c, Jingren Tan c, Guyang Li d
a School of Advanced Interdisciplinary Studies, Hunan University of Technology and Business, Changsha 410205, PR China
b Industrialization Department, Xiangjiang Lab, Changsha, Hunan 410205, PR China
c Department of Civil Engineering, Central South University, Changsha 410075, PR China
d China Railway No.5 Engineering Group Electrical Engineering Co., Ltd, Changsha 410006, PR China
Received 22 August 2024, Revised 15 November 2024, Accepted 25 December 2024, Available online 26 December 2024.
https://www.sciencedirect.com/science/article/abs/pii/S095741742403183X
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com