Cross-river railway tunnel of Line 22 go to Chongming Island. After a long distance of 9 kilometers under the Yangtze River, the "Shenchong" super-large shield machine with a diameter of 13.5 meters has successfully arrived at the receiving well recently, ...
http://sh.people.com.cn/BIG5/n2/2025/0314/c134768-41163535.html
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com
http://sh.people.com.cn/BIG5/n2/2025/0314/c134768-41163535.html
22號線越江隧道全部貫通 崇明島將不再沒有軌交
sh.people.com.cn22號線越江隧道全部貫通建成后將結束崇明島沒有軌道交通的歷史經過長江江底長達9公裡的長距離穿越后,直徑13.5米的“申崇號”超大盾構機近日順利抵達接收井,上海軌道交通22號線(崇明線)工程北港越江大盾