English | Spanish | Dutch
Log in

Rishikesh-Karanprayag rail line tunnel boring work 2nd fastest in world says top official

    A. Luthra
    By A. Luthra Replies (1)

    The 14.58-km tunnel between Devprayag and Janasu has just been completed by Single Shield TBM at an average rate of 413 metres per month,

    https://www.theweek.in/wire-updates/national/2025/04/15/del101-rail-fastest-tunnel-rishikesh.html

    Null

    image

    image