English | Spanish | Dutch
Log in

China: Shield machine of south line of Yellow River tunnel starts boring in Jinan

    Caihong Wen
    By Caihong Wen Replies (1)

    The Yellow River tunnel has a total length of 3,888 meters, with 3,252 meters to be excavated using a shield machine.

    https://english.news.cn/20250510/817abb5f48194b0d94030fa3eeebeb53/c.html

    Null

    image

    image