English | Spanish | Dutch
Log in

Seoul Metropolitan Government starts construction of tunnel for extension of subway line 8

 

Seoul Metropolitan Government announced that it will start construction of the tunnel under the Han River today (Thursday) to build the section between Amsa-dong and Guri-si Topyeong-dong, Gangdong-gu, on the extension of subway line 8. The extension of subway line 8 (Byeolnae) starts from Amsa Station in Gangdong-gu, passes through Guri-si, Gyeonggi-do and extends 12.9km to Namnaeju-si Byeolnae-dong. Six stations will be constructed.

The  part in Han River basin will have the tunnel depth 52m and the length of  1,279m. The Han River Basin Tunnel section is a very dangerous and difficult construction section with an atmospheric pressure of up to 4.7 times at a depth of 52m (bottom) from the surface. The pressure (earth pressure and water pressure) of the tunnel penetrating 1,279m of total length is expected to reach 4.7bar (Kg / cm²).

For the tunnel construction the Tunnel Boring Machine will be used for environmental and efficiency reasons. It is bored from Gupyeong Topyeong-dong to Amsa-dong, Gangdong-gu. It is scheduled to be completed in September 2023.
 

https://www.youthassembly.kr/news/50725
 

 

  • Daniela Garroux Oliveira
    By Daniela Garroux Oliveira

    Do you know the contractor? I couldn´t find anything in English so far about it.

  • Ji-Yu Doko
    By Ji-Yu Doko

    Seoul Line 8 extension project give 77.1 billion won for 54 electric subway cars order to Woojinsan Electric Company, which also produced 336 electric subway cars for Seoul Line 5 and 7 last year.

    http://www.pmnews.co.kr/100860

    [국토매일] 우진산전, 별내선 전동차 54량 수주

    www.pmnews.co.kr

    [국토매일-장병극 기자] 지난해 서울 5·7호선 전동차 336량 수주에 성공하며 전동차 제작의 포문을 열었던 우진산전이 서울시 8호선 연장 사업(이하 별내

image

image