English | Spanish | Dutch
Log in

HS2 Cutterhead of TBM Anne from the Victoria Road Crossover Box

HS2 Cutterhead of TBM Anne from the Victoria Road Crossover Box
By Kris Lubcek

 

HS2 Cutterhead of TBM Anne from the Victoria Road Crossover Box_cropped

from High Speed 2 project media: https://mediacentre.hs2.org.uk/news/the-northolt-four-new-tunnelling-machine-joins-three-others-digging-high-speed-line-under-london

image

image