New Zealand: Auckland starts with below ground investigations for Light Rail
https://vimeo.com/654347369/8cdd77c309 Auckland Light Rai...rt of below ground investigations to test soil and water conditions. The Minister o...rceptor, Auckland Council’s underground wastewater pipeline. Informatio...Terratec delivers 4.27-m EPB TBM for the South Bangkok Cable Tunnel Project
Aussie company Terratec delivered a 4.27-m diameter Eart...an average overburden of 35 m (114 ft) and a groundwater head of about 3 bars. The TBM...supply will be via rail bound equipment. As the water pressure is high, the TBM has...Modernization works of the Perales del Río tunnel in Madrid in progress
The Ministry of Transport, Mobility and Urban Agenda (Mitma) advances...ur lanes of 3.50 meters wide each. The actions carried out include waterproofing work to prevent water seepage, coating to improve a...
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com