Aerial LiDAR survey begins for Mumbai-Ahmedabad bullet train project
Important step for the project with 87.5 km of viaducts and bridges, 25 crossing bridges, a tunnel, 97.50 km of roads, one station, a maintenance depot, 4 sub-maintenance depots. https://www.knocksense.com/mumbai/aerial-lidar-survey-begins-for--mumbai-ahmedabad-bullet-train-projectPhilippines, Japan sign cooperation on road tunnel construction
The Japan Ministry of Land, Infrastructure, Transport and Tourism (MLIT) Tetsuo Saito signed a Memorandum of Cooperation (MoC) with the Department of Public Works and Hi...Challenges of building twin rail tunnels under urban Hong Kong
Bouygues TP descrives the Tuen Mun-Chek Lap Kok Link tunnel as; The 5 kilometre-long Tuen Mun-Chek Lap Kok Link twin-tube tunnel will link the New Territories in the...Belgium: SPIE modernises communication systems in Flemish tunnels by integrating DAB+ digital radio
SPIE Belgium, a subsidiary of the SPIE group, the independent European leader in multi-technical services in the areas of energy and communications, is extendi...Uttarakhand Government To Enforce Stringent Tunnel Construction SOPs Post-Silkyara Incident
The Uttarakhand government is set to establish comprehensive standard operating procedures (SOPs) for the construction and maintenance of tunnels,... https://swarajyamag.com/infrastructure/uttarakhand-government-to-enforce-stringent-tunnel-construction-sops-post-silkyara-incident
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com