Grand Paris Express: Excavation of line 15 South is completed
https://www.youtube.com/watch?v=Q_0qqcbX4O4 This Monday, December 20, 2021, the last tunnel boring machine of line...naries and gateways. The Grand Paris express continues to take shape in a very concr...The last HS2 tunnel boring machine in the West Midlands starts digging towards Birmingham
The 1,600 tonne tunnel boring machine has started digging the second bore of HS2’s Bromford Tunn...as an ‘underground factory’, both TBMs will put a total of 41,594 concr...Historic moment as HS2 launches first giant Herrenknecht tunnelling machines
The TBM 'Florence' is the first one of the 10 Herrenknecht Tunnel Boring Machines that will be launched....s as a self-contained underground factory - digging the tunnel, lining it with concr...Tunnel Job: Senior Structural Engineer - Tunnels ( Mississauga, ON, Canada)
I would like to inform you my fellow tunnellers of the following job opening. I am not associated with the rec...bsp; Your work will focus on structural design components including reinforced concr...Singapore's LTA and SIT Establish Centre for Infrastructure and Tunnel Engineering
New Centre to Strengthen Singapore’s Tunnelling and Infrastructure Development Capabilities The L...carrying out looks into the Design, Detailing, and Specification of Reinforced Concr...
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com