Lower Thames Crossing tunnels and systems director Keith Bowers said that the project faces "huge challenges" due to its "highly sensitive" location
https://www.newcivilengineer.com/latest/lower-thames-crossing-dubbed-most-ambitious-road-job-since-m25-09-12-2019/
map shows tunnel boring machines under the Thames
https://www.ianvisits.co.uk/blog/2019/11/20/new-map-shows-tunnel-boring-machines-under-the-thames/
#TBM #London
...the Frogmore Connection Tunnel from Wandsworth to Fulham as part of the Thames Tideway Tunnel project to stop the dumping of untreated sewage to Thames river.
#pollution
https://w...
The Thames #Tideway tunnel is now almost half complete and still on budget.
Project pro...sed £3.8bn budget for capital works.
https://www.newcivilengineer.com/latest/thames-tideway-project-nears-halfway...
Construction of the Thames Tideway project, London’s super-sewer, is now 48% complete.
https://www.theconstructionindex.co.uk/news/view/tideway-tunnel-nears-halfway-point-ahead-of-schedule
Setback for the Highways England. Poor preparation is always costly.
https://www.essexlive.news/news/essex-news/lower-thames-crossing-huge-8m-4742098
4D construction planning has delivered £1m in savings on the eastern section of the Thames #Tideway Tunnel, part of the UK’s largest-ever water infrastructure project.
https://www.pbctoday.co.uk/news/bim-news/construction-planning-in-4d/68410/
#TidewayTunnel #ThamesTideway
4D construction planning has delivered £1m in savings on the eastern section of the Thames #Tideway Tunnel, part of the UK’s largest-ever water infrastructure project.
https://www.pbctoday.co.uk/news/bim-news/construction-planning-in-4d/68410/
#TidewayTunnel #ThamesTideway
...Riverings.
This project is to construct two one-way two-lane road tunnels with a total length of 1.4km and a 12.4m diameter through the lower Thames to connect the Silvertown and...