Reply on topic: Fresh Update on London's Thames Tideway Tunnel Project
TBM Annie will drive a 4.5km tunnel from Greenwhich Pumping Station to connect with the main 25km long Tideway Tunnel at Chambers Wharf in Bermondsey. https://www.newcivilengineer.com/latest/assembly-starts-on-tbm-for-key-tideway-connection-tunnel-29-07-2020/ #Tideway #ThamesTidewayUnited Kingdom: Tideway | Cost of Londons super sewer hits 4.5bn
Tideway updates its cost estimate for the Thames Tideway Tunnel to 4.5bn... https://www.newcivilengineer.com/latest/tideway-cost-of-londons-super-sewer-hits-4-5bn-26-04-2023/Tags: Tideway
Tags: Tideway, TidewayTunnel, ThamesTideway
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com