Null

English | Spanish | Dutch
Log in

Results for "VINCI Construction France"

Comments

    • Ji-Yu Doko

      Comment on "Discussion replies"

      Hello. Construction contractor for Seoul Metro Line 8 Extension is SsangYong Engineering & Construction Co Ltd. Zip code 05510) 299 Olympic-ro, Songpa-gu, Seoul...111 e-mail : ssyenc@ssyenc.com It is a big company. Much constr...

      • Paolo Kerguel

        Comment on "Comments"

        ENR's list is different from ICON in its methodology. ICON ranks the construction contractors according to their total revenues. On the other hand, ENR ranks international constr...

      • +15 more Comments

      Blogs

        • Billy Gundry

          Tunnel Training

          There are thousands of tunnels in the UK, with more being built each yea...tunnels are also found under construction and refurbishment sites. With...for anyone working in tunnel construction – as well as general he...safe working in tunnels under construction. Both provide a minimum stand...

          • Jørn Sørensen

            Breakthrough in the 10,8km Sandoy undersea tunnel between two islands of the Faroe Islands

            Swedish construction company NCC achieves another exceptional breakthrough in Faroe Isla...nk NCC who are very technically skilled in tunnel construction, and where we have avoided in...Two subsea tunnels in simultaneous production Constr...

          • +5 more Blogs

          Discussion topics

          Files

          Pages

          Top-level pages

            • Martin Sirzo

              TBM Producers List

              Alphabetical List of Tunnel Boring Machine Producers. (Main TBM Manufacturers). CRCHI (China)  CREG (China) China Railway Engineering Equipment Group Co. L...

              • Pankaj

                Cutter and tools

                    Shandong Tian You Tunnel Engineering Equipment Co., Lt...grease for urban rail engineering construction     The com...ficates issued by the state and provincial at the provincial level.     The products...d and stable partnership with many constr...

              • +1 more Top-level pages

              Events

              Videos

              Wall posts

                • Alan Limbach

                  Europe's #VINCI Construction wins a contract for the Annacis Island wastewater treat...da https://www.streetinsider.com/Globe+Newswire/VINCI+Construction+wins+a+contract+for+the+Annac...t+in+Greater+Vancouver%2C+Canada/16013705.html #vinciconstr...

                  • André Tarry

                    JV Marti Meyrin, Marti Tunnel and Impenia build the next generation tunnel for CERN in Switzerland and france. https://www.enr.com/articles/48009-geneva-physicists-look-to-future-but-their-tunnels-are-being-built-now

                  • +107 more Wall posts

                  Groups

                  Tags

                    • Marc Guitar

                      Special shaft allows two TBMs cross the paths at Paris metro lines 14 and 15.

                        Thanks to a special structure in a 63-metre wide shaft 55 metres below the Gustave Roussy Institute, the tunnel boring machine 'Allison; boring the line 14 South crossed over the future Line 15.  Thanks to this, Allison can continue moving towards the Maison-Blanche station. ...

                      Tags: Dodin Campenon Bernard, VINCI Construction, VINCI Construction Grands Projets, VINCI Construction France, Botte Fondations, Spie batignolles génie civil, Spie batignolles fondations