TBM breakthrough at Perth's Forrestfield-Airport Rail Link project
8 km boring for Grace, the TBM is over with the breakthrough the through the Bayswater dive structure. Sandy, the other TBM is expected to do the same sometime in May this year. https://tunnellingjournal.com/first-forrestfield-airport-link-tbm-completes-challenging-journey/Afcons Achieves Another Breakthrough with TBM Sudarshan 8.1 at Begumpul RRTS Station
Afcons achieved its fifth tunnel breakthrough out of the six planned breakthroughs on Package 8 of the semi-high-speed rail project, with S88 marking the final break...Final Breakthrough achieved for Mumbai Metro Line-3’s UGC-05
J Kumar Infraprojects – China Railway Tunnel Group JV operated Tunnel Boring Machine made a breakthrough at Dharavi Station’s northern-end. This is the final breakthrough for (TBM) S64 on Mumbai...uy.com/2020/08/19/tbm-s64-makes-final-break...Maharashtra: Breakthrough for India’s widest tunnel at Igatpuri
Breakthrough at India's widest (17,5m wide) and 4th longest tunnel (8km) at Kasara Ghat near Igatpuri on the Nashik highway. https://timesofindia.indiatimes.com/city/mumbai/mumbai-breakthrough-for-indias-widest-tunnel-at-igatpuri/articleshow/86244918.cms
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com