West Cumbria water pipeline work wins New Civil Engineer Award "for demonstrating to the rest of the industry that with an innovative approach you can use existing technology to work further and faster, which helps keep costs down and minimize inconvenienceā.
1.25km tunnel, the longest ever built in UK using pipe-jacking, completed it in a record 3 months beating the previous record by 300m and 8 months.
https://www.cumbriacrack.com/2019/12/19/west-cumbria-water-pipeline-scheme-wins-engineering-award/
#trenchless #pipeJacking #FarransRoadbridge #WardandBurke
A major new water supply scheme in Cumbria has been given the thumbs up with a prestigious engineering award.
Paolo Kerguel liked this
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com