J Kumar Infraprojects – China Railway Tunnel Group JV operated Tunnel Boring Machine made a breakthrough at Dharavi Station’s northern-end. This is the final breakthrough for (TBM) S64 on Mumbai Metro’s 33.5 km Aqua Line (Line-3).
source:
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com
https://themetrorailguy.com/2020/08/19/tbm-s64-makes-final-breakthrough-for-mumbai-metro-line-3s-ugc-05/
TBM S64 Makes Final Breakthrough for Mumbai Metro Line-3’s UGC-05
themetrorailguy.comMoments ago, Tunnel Boring Machine (TBM) S64 operated by the J Kumar Infraprojects – China Railway Tunnel Group JV made a breakthrough at Dharavi Station’s northern-end on Mumbai Metro’s 3