December 3 Hoban Industry Tunnel Boring Machine breakthrough at Banpocheon Basin Separation tunnel in Seocho-gu. President of Hoban Industry Kim Jin-won and company people attended ceremony.
The 1162m 'Banpocheon Separation Tunnel' is constructed to improve drainage in Seoul Gangnam Station Area. Completion is March 2022. Hoban Industry bored 944 meter with Gripper TBM.
Hoban Industry awarded this year also “GTX-A Section 5” and “Dobongsan-Okjeong Metropolitan Railway Section 2” tunnel construction contracts.
https://biz.chosun.com/site/data/html_dir/2020/12/03/2020120301900.html
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com
https://biz.chosun.com/site/data/html_dir/2020/12/03/2020120301900.html
호반산업, 서초구 ‘반포천 유역 분리터널 건설공사’ 터널 관통
biz.chosun.com호반산업이 서울 서초구 ‘반포천 유역 분리터널 건설공사’의 터널을 성공적으로 관통했다.호반산업은 3일 서초구에서 ‘반포천 분리터널 공사’의 관통..