After more than a decade, construction of Ottawa’s Combined Sewage Storage Tunnel (CSST) has been completed. It will significantly reduce the amount of sewage flowing into the Ottawa River during heavy rainfalls.
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com
https://capitalcurrent.ca/hailed-as-a-huge-step-forward-232m-sewage-tunnel-protects-ottawa-river-from-damaging-overflows/
Hailed as a 'huge step forward,' $232M sewage tunnel protects Ottawa River from damaging overflows | Capital Current
capitalcurrent.caA $232 million overflow diversion tunnel project is now protecting the Ottawa River from overflows of sewage and contaminated stormwater