Herrenknecht India has completed the factory tests of two refurbished tunnel boring machines. They will be used by ITD at Bangalore Metro
https://themetrorailguy.com/2021/01/31/factory-tests-completed-on-itds-bangalore-metro-tbms/
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com
https://themetrorailguy.com/2021/01/31/factory-tests-completed-on-itds-bangalore-metro-tbms/
Factory Tests Completed on ITD’s Bangalore Metro TBMs
themetrorailguy.comTunnel boring machine (TBM) manufacturer Herrenknecht India on Friday wrapped up factory acceptance tests (FAT) on two refurbished TBMs which will be deployed to build a section of Bangalore Metro’s 21.386 km Pink Line (Reach 6). The 3 day tests...