English | Spanish | Dutch
Log in

The first tunnel of ECRL in Malaysia is 98.5% penetrated

    Yi  Wei
    By Yi Wei Replies (1)

    The East Coast Rail Link (ECRL) project 6 months ahead of schedule with 1.1 kilometer Paka tunnel. It is now 98.5% penetrated. Paka is one of the 59 tunnels in the project. Utusan report Chairman of Malaysia Rail Link Sdn. Bhd. (MRL), Tan Sri Mohd. Zuki Ali declared this news.

    https://www.utusan.com.my/berita/2021/04/terowong-pertama-ecrl-di-paka-98-5-peratus-siap/

    image

    image