9.98m diameter dual-mode (EPB / single shield) TBM designed and manufactured by CREG for the Cefalù tunnel, Italy completed its live FAT at Zhengzhou, China, the headquarters of CREG. The Cefalù railway tunnel project is one of the tender sections of the Palermo-Messina railway line and an important part of the European TEN-T railway network.
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com
http://en.crectbm.com/detail/8791.html
China Railway Engineering Equipment Group Co - CREG’s Φ9.98m Dual-mode TBM for Cefalù Tunnel, Italy Completed FAT
en.crectbm.com